A clear sequence, then the record to match.

We agree the scope first. Our engineers then follow your programme. The documents are finished before we hand the package over.

The order the work follows

Not every package needs every step. What is included is agreed at the start, and then it is done in this order.

  1. STEP 01

    Survey and scope

    We look at the plant and agree what is included, what is not, and how the records should be written.

  2. STEP 02

    Strategy

    We set the control strategy out in writing, to the schedules and the plant you have described.

  3. STEP 03

    Install support

    Our engineers support the BMS installation on site, with the installing team.

  4. STEP 04

    Point-to-point test

    Each point is tested from the field device back to the controller. The result is written down.

  5. STEP 05

    Functional commissioning

    We run the plant and the controls through the sequences, enables and safeties in the strategy.

  6. STEP 06

    Client witnessing

    We attend witnessing with the people you invite, and we record what was seen.

  7. STEP 07

    Handover documents

    Test sheets, snag lists, O&M manuals and other handover documents are issued in your format.

What that means in practice

  • 01

    On site when the job needs it

    We work in the plantroom and on the floors when the job needs people there. Otherwise we support the system remotely.

  • 02

    Reliable

    We complete the agreed scope, including the records.

  • 03

    Clear documentation

    Notes are written so someone who was not there can see what was tested, what was witnessed, and what is still open.

  • 04

    Integrator standards

    We work to your drawings, strategy and document format.

Quality, safety and documentation

  • Site practice

    On site, we follow the safety arrangements and the programme set for the project.

  • Test records

    Point-to-point results, commissioning notes, software loads and graphics checks are written down.

  • Handover documents

    Test sheets, snag lists, close-out notes and handover documents are prepared in the integrator’s format, for the items in the scope.